Allied Engineering was hired to provide MEP and Construction Phase Commissioning services for a new 73,000 SF productions facility building addition.   The new design accommodates future phases, with equipment designed with either modular configuration, or additional capacity where future needs can be documented.

 Mechanical, Plumbing and Fire Protection included HVAC, snow melt, process piping, LP gas, process exhaust, plumbing and roof drainage systems, plumbing systems and fixtures, and design-build fire protection specifications. 

Electrical included service entrance and power distribution, standby emergency generator, equipment power, fire alarm system, wiring and devices, lighting systems/site lighting, and emergency lighting.

 

Structural engineering was provided for the 18,000 s.f. elevated composite floor system for Class A sensitive equipment.